Toyota 20R engine started

We reinstalled the gas tank and got a gallon or two of gas in the tank. We then did a compression test, and confirmed compression stroke /w top dead center on the first piston. Reinstalled all new Silicone vacuum lines and Placed the timing angle at 13* (high altitude) and turned the 20R engine over! She started right up, so it looks like i wont have to rebuild the carb right now. Overall, we still need to adjust the valves when they get warm, and seal up the valve cover. Next step is to fix/flush the clutch slave & wait for the brake booster to show up. Im glad we finally turned the 20R engine over! And the points ignition and distributor still work.

Vacuum Diagram Scribbled
Vacuum Diagram Scribbled

You might be interested in …

Engine Bay Cleanup

Rust Cleanup begins, cleaning and de-greasing.

Read More

Dropping the engine back in

The Engine is back in the engine bay, /w the Resealed L43 4 speed transmission and side linkage. Have the gas tank pulled, being cleaned at the moment. Waiting for a rebuilt distributor since the original may have a damaged diaphragm. New Fuel pump and lines ready to go back in once the rust is […]

Read More

Suspension Day

Installed new front and rear shocks on the Chinook. Also took the time to replace most of the linkages and ball joints. The old upper and lower ball joints had about a cm of grease and dirt coating them. A shop towel or bin came in handy to collect all the junk i scraped off […]

Read More

Leave a Reply